Altana Wave-Scan ROBOTIC Manuale Utente Pagina 10

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 45
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 9
9
English
Commissioning and power supply 3
D1
D2
Power supply:
The instrument is supplied by an
external AC power adapter.
Power supply and data transmission
are combined in a 9-pole sub D plug.
In order to connect the measuring
instrument, first check the wiring and
the matching of the power supply.
Subsequently you plug in the sub D
plug (arrow), and switch on power.
The light-emitting-diode D1 signals the
connected power supply.
The light-emitting-diode D2 blinks
green during the measurement.
If a mistake should happen during the
measurement, it is signalled by a red
blinking light-emitting-diode D2. The
pertinent error code is shown at the
screen.
Vedere la pagina 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 44 45

Commenti su questo manuale

Nessun commento